Son La Hydraulic - Hydropower Project

01:53' CH-24, 24/02/2014

1. Stage: Technical Design
2. Consultant: Power Engineering Consultants Company No.1 (PECC1)
3. Project Owner: EVN
4. Project scale: Installed capacity: 2400MW
5. Appraisal time: 2005
6. Appraisal results: Requirement satisfaction

Son La Hydropower Plant is the largest one in Southeast Asia. The plant was commenced in 02/12/2006 and its unit No.I was proposed to be put in operation in 12/2010.

Son La hydropower Plant with proposed installed capacity of 2,400 MW will be connected to the national power network by four 500 kV-power line namely Son La - Hoa Binh, Son La - Nho Quan, Son La - Viet Tri and Son La - Soc Son. Son La 500 kV transformer station is proposed to be placed at Pi Toong area, 3 to 4 km away from the plant.

Parameters of the plant:

  • Reservoir area: 224 km2. Total storage capacity: 9.26 billion m3.
  • Installed capacity: 2.400 MW, 6 units.
  • Annual average power output:: 9.429 billion kWh.
  • Project grade: special.
  • Total investment cost: VND 42,476.9 billion (of which initial investment cost: VND 36,786.97 billion and interest in the construction time: VND 5,708 billion).
  • Project owner: EVN
  • Main contractor: Da river corporation
  • Contractor of RCC dam: Da river Joint-stock Company No.9.
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,